The construction works of the Water Reservoirs in Limassol are progressing as planned. The Water Reservoirs supply the wider Limassol District with potable water and ensure the uninterrupted provision of sufficient quantities of water of satisfactory quality to domestic and industrial consumers. The construction of all Water Reservoirs is funded entirely by EOA Limassol.
Projects Already Completed
The following water reservoirs have already been constructed and are currently within the defects liability period, during which the final minor outstanding works are being carried out:
Sykaminou Area, Agios Athanasios – Capacity: 2,000 m³
Kato Polemidia Area – Capacity: 2,000 m³
Germasogeia Area – Capacity: 4,000 m³
Agia Fyla Area – Capacity: 800 m³
Ongoing Water Reservoir Projects
EOA Limassol continues to invest in modern infrastructure, with the aim of enhancing citizens’ quality of life and ensuring the sustainable management of the district’s water resources.
In this context, tenders have been announced through the Electronic Procurement System (e-Procurement) for:
the construction of two new Water Reservoirs and pumping stations in Mesa Geitonia and Fasoula, each with a capacity of 2,000 m³;
the construction of one Water Reservoir with a capacity of 5,000 m³ in the Paniotis area of Germasogeia.
The construction of the new Reservoirs was deemed necessary for the further strengthening of the water supply network and the improvement of the services provided to consumers. Their development will ensure a continuous and uninterrupted water supply while also meeting the needs of newly developed areas. In this way, citizens will benefit from enhanced reliability and improved water supply services, while the system’s ability to meet increasing water demand will also be secured.
Furthermore, a tender is currently being prepared for the construction of six new Water Reservoirs, each with a capacity of 1,000 m³, of Glass Lined Steel (GLS) type, together with pumping stations, in the areas of Agios Athanasios and Fasoula.
--------------------------------------------------------------------------------------------------
14 May 2026
The construction works of the Water Reservoirs in Limassol are progressing as planned. The Water Reservoirs supply the wider Limassol District with potable water and ensure the uninterrupted provision of sufficient quantities of water of satisfactory quality to domestic and industrial consumers. The construction of all Water Reservoirs is funded entirely by EOA Limassol.
The construction of the following Water Reservoirs has already been completed:
Sykaminou Area, Agios Athanasios – Capacity: 2,000 m³
Kato Polemidia Area – Capacity: 2,000 m³
In the areas of Germasogeia and Agia Fyla, construction works are progressing as planned and are expected to be completed in May 2026:
Germasogeia Area – Capacity: 4,000 m³
Agia Fyla Area – Capacity: 800 m³
Ongoing Water Reservoir Projects
Tenders have been announced through the Electronic Procurement System (e-Procurement) for:
the construction of two new Water Reservoirs and pumping stations in Mesa Geitonia and Fasoula, each with a capacity of 2,000 m³;
the construction of one Water Reservoir with a capacity of 5,000 m³ in the Paniotis area of Germasogeia.
Furthermore, a tender is currently being prepared for the construction of six new Water Reservoirs, each with a capacity of 1,000 m³, of Glass Lined Steel (GLS) type, together with pumping stations, in the areas of Agios Athanasios and Fasoula.
The construction of the new Reservoirs was deemed necessary for the further strengthening of the water supply network and the improvement of services provided to consumers. Their development will ensure a continuous and uninterrupted water supply while also meeting the needs of newly developed areas. In this way, citizens will benefit from enhanced reliability and improved water supply services, while the system’s ability to meet increasing water demand will also be secured.
-----------------------------------------------------------------------------------------------------
31 March 2026
Progress of Construction Works for New Water Reservoirs of EOA Limassol
The construction works of the Water Reservoirs in Limassol are progressing as planned. The Water Reservoirs supply the wider Limassol District with potable water and ensure the uninterrupted provision of sufficient quantities of water of satisfactory quality to domestic and industrial consumers. The construction of all Water Reservoirs is funded entirely by EOA Limassol.
The construction of the Water Reservoir in the Sykaminou area of Agios Athanasios, with a capacity of 2,000 m³, has already been completed.
In the areas of Kato Polemidia, Germasogeia and Agia Fyla, construction works on the water reservoirs are progressing as planned and are expected to be completed in May 2026:
Kato Polemidia – Capacity: 2,000 m³
Germasogeia – Capacity: 4,000 m³
Agia Fyla – Capacity: 800 m³
Water Reservoir Projects in Progress
A tender has been announced through the Electronic Procurement System (e-Procurement) for the construction of two new Water Reservoirs and pumping stations in Mesa Geitonia and Fasoula, each with a capacity of 2,000 m³.
Furthermore, tenders are in the process of being launched for:
the construction of an additional Water Reservoir with a capacity of 5,000 m³ in the Paniotis area of Germasogeia;
the construction of six new Water Reservoirs, each with a capacity of 1,000 m³, of Glass Lined Steel (GLS) type, together with pumping stations, in the areas of Agios Athanasios and Fasoula.
The construction of the new Water Reservoirs was deemed necessary for the further strengthening of the water supply network and the improvement of services provided to consumers. Their development will ensure a continuous and uninterrupted water supply while also meeting the needs of newly developed areas. In this way, citizens will benefit from enhanced reliability and improved water supply services, while the system’s ability to meet increasing water demand will also be secured.
-------------------------------------------------------------------------------------------------
February 2, 2026
Progress of Water Reservoir Construction Works in Limassol
EOA Lemesou informs that the construction works of the Water Reservoirs in the areas of Agios Athanasios, Kato Polemidia, Germasogeia and Agia Fyla are progressing normally.
Area: Sykaminou (Agios Athanasios) – Capacity: 2,000 m³
The project has been completed.
Area: Kato Polemidia – Capacity: 2,000 m³
Area: Germasogeia – Capacity: 4,000 m³
Area: Agia Fyla – Capacity: 800 m³
Expected completion date of the above projects: May 2026
The construction of the new reservoirs was deemed necessary to strengthen the water supply network and improve the services provided to consumers. With the creation of these reservoirs, a continuous and uninterrupted water supply will be ensured, while at the same time the water supply needs of new areas will be met. In this way, citizens will enjoy greater security and better quality water supply services, while the capacity to meet increasing water demand will be safeguarded.
----------------------------------------------------------------------------------------------------------------------------
October 21, 2025
The EOA Lemesos informs the public that construction works for the water reservoirs in the areas of Ayios Athanasios, Kato Polemidia, Yermasoyia, and Ayia Fyla are progressing as planned.
📌 Location: Sykaminou (Ayios Athanasios)
Capacity: 2,000 m³
The Project has been completed.
The construction of the Water Tank has been completed, and both chambers of the Tank have been put into operation. Some external works remain (landscaping, fence restoration, etc.), which will be completed within the maintenance and defect liability period.
📌 Location: Kato Polemidia
Capacity: 2,000 m³
Expected completion date: 15/03/2026 (March 2026)
The concreting works of the foundation slab, the perimeter walls, and the roof of the Tank have been completed. The Project is currently at the stage of constructing the protective chambers for the hydraulic components and applying the internal waterproofing material.
📌 Location: Germasogeia
Capacity: 4,000 m³
Expected completion date: 16/05/2026 (May 2026)
The concreting works of the foundation slab, the perimeter walls, and the roof of the Tank have been completed. The Project is currently at the stage of constructing the protective chambers for the hydraulic components and applying the internal waterproofing material.
Location: Ayia Fyla
Capacity: 800 m³
Expected completion date: 16/05/2026 (May 2026)
The demolition works of the two (2) old Tanks on the plot have been completed. The concreting of the foundation slab and the perimeter walls of the new Tank has also been completed. In addition, the internal waterproofing material has been applied. The Project is currently at the preparation stage for the construction of the Tank's slab.
----------------------------------------------------------------------------------------------------------------------------
June 27, 2025
📌 Location: Sykaminou (Ayios Athanasios)
Capacity: 2,000 m³
Expected completion date: June 2025
The first chamber of the tank, with a capacity of 1,000 m³ (Phase A of construction), has been completed and put into operation. The project is currently in its second implementation phase, during which the construction of the second chamber has been completed and waterproofing inspection is underway.
📌 Location: Kato Polemidia
Capacity: 2,000 m³
Expected completion date: 15/03/2026 (March 2026)
The concreting works for the foundation slab, the perimeter walls of the tank, and its roof have been completed.
📌 Location: Germasogeia
Capacity: 4,000 m³
Expected completion date: 16/05/2026 (May 2026)
The concreting works of the tank’s foundation slab have been completed. The project is currently in the phase of concreting the perimeter walls of the tank.
📌 Location: Ayia Fyla
Capacity: 800 m³
Expected completion date: 16/05/2026 (May 2026)
The demolition works of the two (2) old tanks have been completed. The concreting works of the foundation slab and the perimeter walls of the new tank have also been completed.
----------------------------------------------------------------------------------------------------------------------------
May 6, 2025
📌 Location: Sykaminou (Ayios Athanasios)
Capacity: 2,000 m³
The first chamber of the reservoir, with a capacity of 1,000 m³ (Phase 1 of construction), has been completed and put into operation. The project is now in its second phase of implementation.
Expected completion date: May 2025
📌 Location: Kato Polemidia
Capacity: 2,000 m³
General excavation works and the installation of outlet and drainage pipelines beneath the foundation have been completed. The project is now in its second phase of implementation.
Expected completion date: 15/03/2026 (March 2026)
📌 Location: Germasogeia
Capacity: 4,000 m³
The concreting works of the tank footing have been completed. The project is currently in the phase of shaping and placing the reinforcement for the perimeter walls of the tank.
Expected completion date: 16/05/2026 (May 2026)
📌 Location: Ayia Fyla
Capacity: 800 m³
The demolition works of the two (2) existing old tanks have been completed. Additionally, the concreting of the foundation footing has been finalized. The project is currently in the phase of reinforcement preparation and installation for the perimeter walls of the tank.
Expected completion date: 16/05/2026 (May 2026)
----------------------------------------------------------------------------------------------------------------------------
January 14, 2025
Progress of Water Reservoir Construction Works in Limassol
The EOA Lemesos informs the public that construction works for the water reservoirs in the areas of Ayios Athanasios, Kato Polemidia, Yermasoyia, and Ayia Fyla are progressing as planned.
These water reservoirs supply potable water to the wider Limassol District, ensuring the uninterrupted provision of adequate and high-quality water to both residential and industrial consumers. The construction of all reservoirs is fully funded by the EOA Lemesos.
📌 Location: Sykaminou (Ayios Athanasios)
Capacity: 2,000 m³
The first chamber of the reservoir, with a capacity of 1,000 m³ (Phase 1 of construction), has been completed and put into operation. The project is now in its second phase of implementation.
Expected completion date: March 2025
📌 Location: Kato Polemidia
Capacity: 2,000 m³
General excavation works and the installation of outlet and drainage pipelines beneath the foundation have been completed. The project is now in its second phase of implementation.
Expected completion date: March 2026
📌 Location: Germasogeia
Capacity: 4,000 m³
The project is in the early stages of construction.
Expected completion date: May 2026
📌 Location: Ayia Fyla
Capacity: 800 m³
The project is in the early stages of construction.
Expected completion date: May 2026
October 17, 2024
Construction works for water reservoirs in Limassol district are currently in progress, specifically two (2) water reservoirs in the Municipality of Amathus, one (1) water reservoir in the Ayia Fyla area, and one (1) water reservoir in Polemidia Municipality. In the area of Ayios Athanasios, the water reservoir under construction has a capacity of 2,000 cubic metres. The construction cost amounts to €839,300. The construction works for the project are expected to be completed in January 2025.
The construction of all the water reservoirs is fully funded by the Limassol District Local Government Organisation (EOA Lemesos).
The water reservoirs supply potable water to the wider Limassol District, ensuring the uninterrupted provision of an adequate quantity and satisfactory quality of water to both domestic and industrial consumers.